At this stage, you can make changes to the plan in the following ways:
⦁ Drag the horizontal slider to reach the desired values.
OR
⦁ Double-click the value in the GR, % column and enter the required value in the field.
OR
⦁ Double-click the value (number of packages) in the Plan column and enter the required quantity in the field.
OR
⦁ Double-click the value (number of packages) in the Plan column, click the icon , and in the fields, enter the number of packages you need to add to the current plan.
Note:
If an error occurs during editing, you can cancel the changes. To do this, click the icon .
Important:
The total plan of the regional manager remains unchanged (in our case, 614,290).
If 100 packages were added somewhere, it means you must subtract those 100 packages elsewhere.
If you added a certain number of packages but did not subtract them in another place, the system will display this unallocated quantity.